亚洲ⅴ欧洲第一的日产av,久久99青青精品免费观看,四虎国产精品成人免费久久,婷婷人人爽人人爽人人片,国产精品毛片完整版视频,国产小视频在线高清播放,人妻精品久久无码专区精东影业,99久久国内精品成人免费,怡春院欧美一区二区三区免费,成人福利国产精品视频

您好,歡迎來到濟南通宇恒成自動化工程有限公司網(wǎng)站!

服務(wù)熱線

當前位置: 首頁- 新聞中心 > 客戶見證
常見問題
新聞中心

MNS低壓配電柜安裝規(guī)范是什么?

發(fā)布時間:2021-05-17 來源:http://www.kisansushi.com/ 瀏覽量:

1.安裝前對準備工作的檢查
1. Check the preparation before installation
在安裝前,MNS低壓抽屜柜監(jiān)理工程師及甲方工程師要檢查進場道路是否暢通,必要時要求要求總包單位修建簡易運輸通道與各安裝點連接,施工場地布置應(yīng)滿足文明施工的要求。同時還應(yīng)檢查安裝單位的施工機具安排狀況,督促安裝單位對施工機具進行檢查,確保狀態(tài)良好。壓設(shè)備到達現(xiàn)場前,配電室、地溝、基礎(chǔ)槽鋼應(yīng)已完全竣工
Before installation, the supervision engineer of MNS low-voltage drawer cabinet and the engineer of Party A shall check whether the access road is smooth. If necessary, the general contractor is required to build a simple transportation channel to connect with each installation point, and the construction site layout shall meet the requirements of safe and civilized construction. At the same time, the arrangement of construction machines and tools of the installation unit should be checked, and the installation unit should be urged to check the construction machines and tools to ensure that they are in good condition. Before the pressure equipment arrives at the site, the distribution room, trench and foundation channel steel shall be completely completed
1)、配電室
1) . distribution room
配電室:配電室施工前,低壓配電柜要將建配電室所需的詳細圖紙交予施工方(合同簽訂后2周內(nèi),重 點要落實客戶對圖紙的位置、內(nèi)容、完成時間確認),并且在配電室建設(shè)過程中,我方或協(xié)作單位的技術(shù)人員要在現(xiàn)場監(jiān)督,避免施工錯誤。(配電室建設(shè)大約需2周左右)
Distribution room: before the construction of the distribution room, the low-voltage distribution cabinet shall submit the detailed drawings required for the construction of the distribution room to the construction party (within 2 weeks after the signing of the contract, the key point is to confirm the location, content and completion time of the drawings by the customers), and during the construction of the distribution room, the technical personnel of our party or the cooperating unit shall supervise on site to avoid construction errors( It will take about 2 weeks to build the distribution room)
                           MNS低壓抽屜柜
2)、地基:MNS低壓抽屜柜槽鋼安放位置要與配電室預留的設(shè)備風道相對應(yīng),設(shè)備離墻的小距離要明確(距離太近,設(shè)備的柜門打不開)。(槽鋼焊接大約需2天,我方技術(shù)人員必須到場指導)
2) Foundation: the channel steel of MNS low-voltage drawer cabinet should be placed in the position corresponding to the equipment air duct reserved in the power distribution room, and the small distance between the equipment and the wall should be clear (the distance is too close to open the cabinet door of the equipment)( It takes about 2 days to weld the channel steel, and our technicians must be present for guidance.)
設(shè)備到達現(xiàn)場:
Equipment arrival at site:
3)、若配電室、地基若未建好,低壓配電柜設(shè)備要有存放位置(要防雨或提供必要的防雨材料)。
3) If the power distribution room and foundation are not built, the low-voltage power distribution cabinet equipment should have a storage location (rain proof or provide necessary rain proof materials).
2.安裝
2. Installation
2.1各配電房門窗須嚴密,低壓配電柜房內(nèi)清潔。
2.1 the doors and windows of each distribution room shall be tight, and the low-voltage distribution cabinet room shall be clean.
感謝您的閱讀,希望以上內(nèi)容對您有所幫助,如您想了解更多精彩內(nèi)容請點擊我們的官網(wǎng):MNS低壓抽屜柜http://www.kisansushi.com。
Thank you for reading, hope the above content is helpful to you, if you want to know more wonderful content, please click our official website: MNS low voltage drawer cabinet http://www.kisansushi.com .
首頁首頁 產(chǎn)品產(chǎn)品 電話電話 置頂置頂
欧美喷潮最猛视频| 成全电影免费高清观看| 日韩中文字幕推理片| 免费人成在线现看视频色| 久久久久久久久18禁秘| 国产男女猛烈无遮挡免费视频网址| 欧美日韩无砖专区一中文字| 亚洲日本高清一区二区三区| 天堂资源最新在线| 亚洲小视频网站| 亚洲人亚洲人成电影网站色| 日韩人妻无码一区二区三区99 | 豆国产96在线 | 亚洲| 无码日韩精品91超碰| 国产办公室秘书无码精品| 91久久国产成人免费观看| 婷婷六月天在线| 秋霞电影网| 豪妇荡乳1一5潘金莲2| 人在线看天堂无码| 国内精品久久人妻无码不卡| 极品人妻少妇一区二区| 国产成人无码AV在线播放动漫| 亚洲精品久久久久国产剧8| 最新综合精品亚洲网址| 色诱久久久久综合网ywww| 亚洲一区二区三区在线观看播放| 亚洲日本香蕉视频观看视频| 麻豆成年视频在线观看| 日韩成人福利视频在线观看| 国产日韩av二区三区| aⅴ精品无码无卡在线观看| 亚洲日韩AV秘 无码一区二区| 日韩精品中文字一区二区| 亚洲国产精品久久久久秋霞影院 | 2019久久久高清日本道| 中文字幕在线观看亚洲日韩| 久久777国产线看观看精品| 午夜免费视频| 久久婷婷五月综合97色一本一本| 日本污视频在线观看|