亚洲ⅴ欧洲第一的日产av,久久99青青精品免费观看,四虎国产精品成人免费久久,婷婷人人爽人人爽人人片,国产精品毛片完整版视频,国产小视频在线高清播放,人妻精品久久无码专区精东影业,99久久国内精品成人免费,怡春院欧美一区二区三区免费,成人福利国产精品视频

您好,歡迎來到濟南通宇恒成自動化工程有限公司網(wǎng)站!

服務(wù)熱線

當前位置: 首頁- 新聞中心 > 客戶見證
常見問題
新聞中心

MNS低壓配電柜安裝規(guī)范是什么?

發(fā)布時間:2021-05-17 來源:http://www.kisansushi.com/ 瀏覽量:

1.安裝前對準備工作的檢查
1. Check the preparation before installation
在安裝前,MNS低壓抽屜柜監(jiān)理工程師及甲方工程師要檢查進場道路是否暢通,必要時要求要求總包單位修建簡易運輸通道與各安裝點連接,施工場地布置應(yīng)滿足文明施工的要求。同時還應(yīng)檢查安裝單位的施工機具安排狀況,督促安裝單位對施工機具進行檢查,確保狀態(tài)良好。壓設(shè)備到達現(xiàn)場前,配電室、地溝、基礎(chǔ)槽鋼應(yīng)已完全竣工
Before installation, the supervision engineer of MNS low-voltage drawer cabinet and the engineer of Party A shall check whether the access road is smooth. If necessary, the general contractor is required to build a simple transportation channel to connect with each installation point, and the construction site layout shall meet the requirements of safe and civilized construction. At the same time, the arrangement of construction machines and tools of the installation unit should be checked, and the installation unit should be urged to check the construction machines and tools to ensure that they are in good condition. Before the pressure equipment arrives at the site, the distribution room, trench and foundation channel steel shall be completely completed
1)、配電室
1) . distribution room
配電室:配電室施工前,低壓配電柜要將建配電室所需的詳細圖紙交予施工方(合同簽訂后2周內(nèi),重 點要落實客戶對圖紙的位置、內(nèi)容、完成時間確認),并且在配電室建設(shè)過程中,我方或協(xié)作單位的技術(shù)人員要在現(xiàn)場監(jiān)督,避免施工錯誤。(配電室建設(shè)大約需2周左右)
Distribution room: before the construction of the distribution room, the low-voltage distribution cabinet shall submit the detailed drawings required for the construction of the distribution room to the construction party (within 2 weeks after the signing of the contract, the key point is to confirm the location, content and completion time of the drawings by the customers), and during the construction of the distribution room, the technical personnel of our party or the cooperating unit shall supervise on site to avoid construction errors( It will take about 2 weeks to build the distribution room)
                           MNS低壓抽屜柜
2)、地基:MNS低壓抽屜柜槽鋼安放位置要與配電室預(yù)留的設(shè)備風道相對應(yīng),設(shè)備離墻的小距離要明確(距離太近,設(shè)備的柜門打不開)。(槽鋼焊接大約需2天,我方技術(shù)人員必須到場指導(dǎo))
2) Foundation: the channel steel of MNS low-voltage drawer cabinet should be placed in the position corresponding to the equipment air duct reserved in the power distribution room, and the small distance between the equipment and the wall should be clear (the distance is too close to open the cabinet door of the equipment)( It takes about 2 days to weld the channel steel, and our technicians must be present for guidance.)
設(shè)備到達現(xiàn)場:
Equipment arrival at site:
3)、若配電室、地基若未建好,低壓配電柜設(shè)備要有存放位置(要防雨或提供必要的防雨材料)。
3) If the power distribution room and foundation are not built, the low-voltage power distribution cabinet equipment should have a storage location (rain proof or provide necessary rain proof materials).
2.安裝
2. Installation
2.1各配電房門窗須嚴密,低壓配電柜房內(nèi)清潔。
2.1 the doors and windows of each distribution room shall be tight, and the low-voltage distribution cabinet room shall be clean.
感謝您的閱讀,希望以上內(nèi)容對您有所幫助,如您想了解更多精彩內(nèi)容請點擊我們的官網(wǎng):MNS低壓抽屜柜http://www.kisansushi.com。
Thank you for reading, hope the above content is helpful to you, if you want to know more wonderful content, please click our official website: MNS low voltage drawer cabinet http://www.kisansushi.com .
首頁首頁 產(chǎn)品產(chǎn)品 電話電話 置頂置頂
人妻无码中字在线a| 国产AV无码专区亚洲AWWW| 视频一区视频二区在线视频| 无码抽搐高潮喷水流白浆| 久久精品女人av天堂| 中文字幕精品亚洲无线码二区| 国产精品视频一区二区猎奇| 非会员区试看120秒6次| 欧美亚洲另类制服卡通动漫| 在线 国产 欧美 专区| 午夜短视频日韩免费| 国产一区二区三区av在线无码观看| 国产综合色产在线精品| 久久av无码精品人妻出轨| 亚洲av无码牛牛影视在线二区| 国产成年女人毛片80s网站| 国产中文字幕在线一区| 97精品人妻系列无码人妻| 曰本丰满熟妇xxxx性| 亚洲人成电影网站色mp4| 丰满妇女毛茸茸刮毛| 国产免费视频一区二区| 精品人妻少妇一区二区三区| 亚洲国产精品自在在线观看| 香蕉在线精品一区二区| 熟妇人妻无码中文字幕老熟妇| 囯产精品久久久久久久久久妞妞| 最近免费中文字幕mv在线视频3| 国产一区二区三区精品自拍| 久久久精品国产亚洲AV日韩| 少妇无码av无码去区钱| 亚洲综合精品一区二区三区| 亚洲少妇人妻无码视频| 亚洲国产中文曰韩丝袜| 国产xxxx视频在线观看| 中文字幕Aⅴ人妻一区二区苍井空| 狠狠色婷婷久久综合频道日韩| 无码人妻系列不卡免费视频| 久久精品久久电影免费理论片| 成人综合在线观看| 国产日韩精品欧美一区灰|