亚洲ⅴ欧洲第一的日产av,久久99青青精品免费观看,四虎国产精品成人免费久久,婷婷人人爽人人爽人人片,国产精品毛片完整版视频,国产小视频在线高清播放,人妻精品久久无码专区精东影业,99久久国内精品成人免费,怡春院欧美一区二区三区免费,成人福利国产精品视频

您好,歡迎來到濟南通宇恒成自動化工程有限公司網(wǎng)站!

服務熱線

常見問題
新聞中心

應該怎樣進行維護高低壓電氣成套設備?

發(fā)布時間:2021-01-13 來源:http://www.kisansushi.com/ 瀏覽量:

高壓開關柜是高低壓成套設備中不可缺少的一部分,在電力系統(tǒng)中起著重要的作用,那么,在日常使用時我們高低壓電氣成套設備需要做哪些維護工作呢?
High voltage switchgear is an indispensable part of high-voltage and low-voltage complete sets of equipment, which plays an important role in the power system. Then, what maintenance work should we do for high-voltage and low-voltage electrical complete sets of equipment in daily use?
(一)檢查、清掃開關柜,柜體清潔無灰塵。柜面觀察窗清潔透明。
(1) Check and clean the switch cabinet. The cabinet is clean without dust. The observation window on the cabinet is clean and transparent.
(二)高低壓成套設備柜面元件安裝端正,接線牢固,電度表、高壓帶電指示裝置、繼電器及信號燈工作正常,符合相關規(guī)定。檢查開關位置指示信號燈指示正確。
(2) The cabinet components of high and low voltage complete sets of equipment are installed correctly, the wiring is firm, the watt hour meter, high voltage live indicator, relay and signal lamp work normally, and meet the relevant regulations. Check that the switch position indicator is correct.
(三)檢查開關柜密封良好,門鎖齊全,機械和電氣帶電閉鎖裝置作用可靠,在有電情況下不能打開柜門。手車位置檢測行程開關作用良好,能正確反映手車位置。開關機械位置閉鎖裝置作用良好。高低壓電氣成套設備檢查二次回路連接牢固,接線正確。
(3) Check that the switch cabinet is well sealed, the door locks are complete, the mechanical and electrical live locking devices are reliable, and the cabinet door cannot be opened when there is electricity. The function of the travel switch for handcart position detection is good, which can correctly reflect the position of handcart. The mechanical position locking device works well. Check whether the secondary circuit of high and low voltage electrical equipment is firmly connected and the wiring is correct.
                            電氣成套設備
(四)拉出手車,高低壓電氣成套設備檢查開關柜后部帶電防護檔板作用良好,開關手車拉出后能自動復位。
(4) Pull out the handcart, check the high and low voltage electrical equipment, and check that the electrified protection baffle at the back of the switch cabinet works well, and the switch handcart can reset automatically after pulling out.
(五)檢查高低壓成套設備柜體接地良好,手車接地軌道接觸良好,表面無銹蝕現(xiàn)象。手車推拉應輕松靈活,到位后能自動閉鎖定位,無卡滯現(xiàn)象。
(5) Check that the cabinet of high and low voltage complete equipment is well grounded, the grounding rail of handcart is in good contact, and the surface is free of corrosion. The push and pull of the handcart should be easy and flexible, and it can automatically lock and locate when it is in place without jamming.
(六)電流互感器及過電壓吸收裝置。用抹布擦拭互感器及過電壓吸收裝置表面,高低壓電氣成套設備檢查一次接線緊固情況。檢查互感器二次端子和鐵芯接地良好。
(6) Current transformer and overvoltage absorption device. Wipe the surface of transformer and over-voltage absorption device with cloth, and check the fastening of primary wiring of high and low voltage electrical equipment. Check whether the secondary terminal and iron core of the transformer are well grounded.
 

熱門產(chǎn)品 / HOT PRODUCT

首頁首頁 產(chǎn)品產(chǎn)品 電話電話 置頂置頂
国产成人综合久久精品下载| 玩弄放荡人妻一区二区三区| 2020久久国产综合精品swag | 91精品人妻一区二区三区蜜臀| 亚洲精品久久久久国产剧8| 怡红院av亚洲一区二区三区h| 少妇邻居内射在线| 91午夜福利一区二区三区| 一区二区不卡国产精品| 亚洲色无码专区在线播放| 亚洲综合网一区中文字幕| 亚洲精品久综合蜜| 亚洲人妻一区二区精品| 久久国产成人高清精品亚洲| 日本中文一二区有码在线| 国产香蕉尹人在线视频你懂的 | 国产精品h片在线播放| 亚洲第一综合天堂另类专| 久久天天躁夜夜躁狠狠I女人| 亚洲综合网一区二区三区| 亚洲精品视频熟妇人妻| 韩国精品一区二区三区| 国产精品青青在线观看爽香蕉 | 亚洲人成亚洲人成在线观看| 亚洲欧洲日韩国内高清| 久久亚洲色一区二区三区| 中文字幕无码不卡免费视频| 久久无码人妻影院| 国产精品疯狂输出jk草莓视频| 本免费Av无码专区一区| 99精品在线视频观看| 91久久精品国产| 久久国产亚洲一区二区三区| 国产免费牲交视频| 亚洲av制服一区二区三区| 久热这里只有精品12| 精品一区二区三区在线观看l| 水多多凹凸福利视频导航| 国产盗摄老熟女视频一区二区三区 | 日本道免费精品一区二区| 一二三区国产精品久久|